Industrial Road Repair

REPAIR Cold Asphalt

The REPAIR formula contains highly specialized additives, penetration-grade bitumen, and carefully graded aggregates. To meet internationally accepted specifications, the product is manufactured in a controlled environment under exceptionally strict quality control standards.

  • 100% adhesion of the bitumen binder to the stone aggregate through complete displacement of moisture during the blending process.
  • Maximum workability even during application in cold conditions.
  • No stripping of stone aggregate after placement.
  • Extended life of the final product through resistance against oxidation.
  • Extended shelf life if correctly stored (4 months and even longer) — store under shade, no direct sunlight.

No Tack Coat Required

Use Cold From Pack

Instant Traffic Access

Zero Shrinkage

Engineering Properties

Standard Aggregate Grade 6.7mm – 7.1mm
Bitumen Adhesion 100%
Service Life (Min) 10 Years Proven
Toxicity / Flammability Non-Toxic / Non-Flammable
Shelf Life 4 Months (Closed Sacks)
Coverage Benchmark 1m² @ 18mm Compacted
REPAIR Professional Grade
Standard 25kg Pack

Application Process

Follow this 4-step process to achieve a permanent, structural repair.

Preparation Phase
Phase 01

Site Preparation

Brush out all loose debris, soil, vegetation, and oil. Any standing water must be removed first. Once the hole is clear of water, REPAIR is moisture-tolerant and can be applied even if the surface is still damp.

Material Filling
Phase 02

Void Saturation

Tip REPAIR directly from the sack. For deep holes, use REPAIR Roadbase for the lower layers, ensuring a 20mm top finish of Standard Grade material.

Shaping Phase
Phase 03

Levelling & Shaping

Spread with a steel rake or shovel. Aim for a slight surcharge (approx. 10mm) above the surrounding surface to account for final compaction density.

Compaction Phase
Phase 04

Final Compaction

Apply mechanical compaction using a plate compactor or roller. The material is formulated to remain flexible for some hours to prevent brittle cracking while accepting traffic immediately.

Optimization Tip

Maintain wet contact surfaces on all tools to prevent binder adhesion during the installation process.

Structural Warning

Strictly avoid the use of diesel or solvent-based agents, as they will permanently compromise the chemical binder.

Quality Assurance

REPAIR is manufactured to the highest global standards to ensure consistent performance in every bag.

Global Compliance

Produced to meet and exceed Internationally accepted specifications for permanent road repair materials.

Specialized Additives

Our unique formula contains highly specialized additives that prevent bitumen stripping and oxidation.

Strict Control

Manufactured in a strictly controlled environment with extreme levels of quality control and testing.

Coverage Examples

16m²
16m x 1m @ 15mm
16 BAGS
69m²
23m x 3m @ 20mm
104 BAGS
54.4m²
34m x 1.6m @ 30mm
109 BAGS

Coverage Calculator

Calculate your exact REPAIR requirements. Enter dimensions below to see the 25kg bag estimation.

5m
2m
Area Preview
10m²
Estimated Requirement
6
25KG BAGS
*Important Estimation Only:

Actual coverage may vary based on base roughness and final compaction. Always round up.

Request a Formal Quote

Ready to Plan?

Build a Permanent Repair Plan

Get official project pricing or run the numbers yourself — we're ready when you are.

Chat on WhatsApp
Call WhatsApp Quote